Please note : This help page is not for the latest version of Enterprise Architect. The latest help can be found here.

Create Baselines

Access    Project Browser package context menu | Package Control | Package Baselines: New Baseline


Create the new baseline using the New Baseline dialog, as indicated below:



See also


Display the package name of the currently selected model branch.


Manage Baselines


Type a unique version reference for this Baseline, which can consist of any alphanumeric characters.

The Package Baselines dialog sorts the Baselines according to the value of this field.



Include Sub-packages

Include the entire sub-package hierarchy of this branch in the Baseline; this option defaults to selected.

If you deselect the checkbox, only the immediate contents (XMI stubs) of the package are included in the Baseline.




Edit the default current time and date to any other value.

The field is a single-line entry, for display on the Package Baselines dialog (a one-line-per-entry list).




Click to create a new Baseline and return to the Package Baselines dialog.




Package Baseline facilities are available in the Corporate, Business and Software Engineering, Systems Engineering and Ultimate editions of Enterprise Architect