Perform a Project Data Transfer
Warning: |
During a project data transfer, all records in the target project are overwritten. Before performing the transfer, take a backup of the target project to ensure that you can recover any important information it contains. |
Notes: |
|
To perform a project data transfer, follow the steps below:
- Select the Tools | Data Management | Project Transfer menu option. The Project Transfer dialog displays.

- Click on the option for the required transfer type. You can choose from:
- .EAP to .EAP
- DBMS to .EAP
- .EAP to DBMS
- DBMS to DBMS
- In the Source Project and Target Project fields, type or select the name or connection string for the Source and Target projects.
- If you want to capture the transfer in a log file, select the Logfile checkbox and browse for the appropriate log file location.
- Click on the Transfer button.
It is good practise to do a Project Compare after this process to verify that all records are written.
The material ("material" includes all pages, documents and on-line graphics) on this web site is protected by copyright law. (C) 1998-2010 Sparx Systems Pty Ltd.