Metrics
To enter metrics for an element, follow the steps below:
- Select the element.
- Select the View | Project Management menu option. The Project Management window displays, showing the Resource Allocation tab.
- Click on the Metrics tab.
- Click on the New button on the Project Management window toolbar. (If the window does not display as shown, click on the Show/Hide Properties button on the toolbar.)
The Metrics tab enables you to enter the following data:
- A name for the metric (short description)
- The type of metric (click on the drop-down arrow and select, or type the name in; type names are not added to the global metric type list)
- A weighting for the metric
- Some notes on the metric (this text is also displayed in the Notes window; it cannot be edited in that window).
To edit an existing item, click on the required item in the list on the left of the window.
Note: |
Although Enterprise Architect does not currently provide detailed reports on metrics within a model, you can use the Automation Interface or similar tools to create your own custom reports based on metric information you enter; |
The material ("material" includes all pages, documents and on-line graphics) on this web site is protected by copyright law. (C) 1998-2008 Sparx Systems Pty Ltd.