Feature proposal V1. R1
1. Tasks and issues properties.
Tasks and issues should have the following properties:
Task name
Type.
Status
Priority
Owner
Assigned to
Total time
Actual time
Start date
End date
Percent
Description.
Comments (History).
Benefits.
- Increased work assignment and tracking capabilities.
- A better integration with planning tools (i.e. MS Project and others)
2. New task element in Custom diagrams
A new Task element should be added to the existing: Requirement, Change and Issue. This element should have the properties described in Requirement 1.
A task, should have the same capabilities to be linked to another element, same as Requirements.
If a task is linked to an element, it will be viewed in the element Maintenance window. If it is not, the parent element will be the model, so it will be viewed in the System (model) window (as a model task).
Besides implementation of tasks, all other items in the System and Maintenance tabs/workspaces should be converted to elements (just like the requirement and change elements).
Benefits:
Increased usability in element task assignment.
(CJ you could have better arguments regarding benefits)